Originally Posted by
ViewAskew
Thanks again for all the knowledge. So if I understand correctly, I should get like an 18 gauge wire, put a round connector on both ends and hook it up to the screw on the back of the deck with the other ground then run it back to the security screw at the back of the cge that holds it in place? Or disconnect the ground from the deck and solder it to the new wire and run it down to the security screw? Thanks for the patience with me, I enjoy doing this stuff and would like to get to the point it looks like I know what I'm doing.