For the 7 bolt block and rods there is no machining at all. I have a friend with some forged 7 bolt rods I can buy. If the combo will work for strokers it'll drop my price by $300+.
My dad came by with a 13" long piece of 3"x3" 1/4" thick angle iron yesterday for the carrier bearing base. I drilled out some holes to slip it over the front gas tank studs then we marked out the holes where the exhaust hangar used to bolt up at the end of the tunnel and drilled some holes there as well. We now have four bolts to hold the steel in place and can weld it to the unibody in a few spots too. We'll be adding some 2" square, 1/4" wall, box steel to either side for dropping some bolts through for hangar studs. I think I'll hit the hardware store and pick up some log bolts that will drop through the angle iron and box steel for studs and weld the heads to the angle iron. Hopefully I'll get some pictures of all this up later today.
Bookmarks