The Galant Center - Powered by vBulletin

Thread: A supersupercharger on Galant 9

Page 1 of 6 12345 ... LastLast
Showing results 1 to 20 of 116
  1. #1

    A supersupercharger on Galant 9

    Hi all! I want to tell about the fabrication of the SC kit for 4G69. At the club 9G i told about this, but 9G does not exist. You do not know the final of this story. So. In may 2010 i started the manufacture of a supercharger kit.I bought the compressor PC 23 E. Later he brought me a lot of problems, but all in order. Write through a translator, i 'm sorry. If it is possible to edit my posts, for understandable language. Why the name of the theme with two pages super? I do not know how to edit. Help to remove one word super from the title.
    Last edited by stayer; 04-05-2011 at 04:57 AM

  2. #2
    Compressor delivers 0,7 bara (10,15 PSI) with 50,000 rpm. Increase speed by means of a belt.
    Last edited by stayer; 04-05-2011 at 01:27 AM

  3. #3
    I first began to measure, as it will be installed.Poorly. Little space. He did not set where the belt.

  4. #4
    I decided to do the same circuit as RIPP.

  5. #5
    At first i made a shaft and a pipe. Later pipe manufactured anew, changed the landing of the bearings. Later pipe manufactured anew, changed the landing of the bearings. The shaft is made of 4140 steel. . Bearings japanese NSK.

  6. #6
    In the city of Perm where i live a lot of military plants and factories. It makes engines for space rockets "proton". At this plant i have made mounting brackets. This is done with the help of laser.

  7. #7
    The pipe is fixed in such a way. For fastening i developed a new nut and he made them.

  8. #8
    Further it is necessary to conduct work where the belt. Technological bracket should be cut into 1- inch. Even made a part for installation of the parasitic pulley.

  9. #9
    Further held parasitic pulley and bought a new belt.

  10. #10
    Further it is necessary to install the compressor. I made the initial assembly of the shaft. For turning grooves use the milling machine.

  11. #11
    Then made a bracket for mounting of the compressor.

  12. #12
    In my plan so must secured compressor.

  13. #13
    For tensioning belt is bolt on the back side.

  14. #14
    Further it is necessary to clean all the welding seams and painting powder paint made in the thermo chamber.
    Last edited by stayer; 04-05-2011 at 02:27 AM

  15. #15
    Then manufactured pipe for the MAF sensor. Sanded it at the factory. Now he looks so

  16. #16
    In parallel with the installation of the compressor, i did inscriptions. My friend from the forum club 9g.ru (welcome) designer.He made computer inscriptions.

  17. #17
    Inscriptions liked me and i cut them with a laser.

  18. #18
    Here are some options for accommodation.

  19. #19
    Later i closed my shaft pipe made of polished steel.

  20. #20
    Then i opened the valve cover and increased thermal valve clearance. AND the cover handled by sandblasting machine.